MVME2604-1161B 機(jī)械備件
本節(jié)中提供了 伺服電機(jī)電纜接線信息P輸出和危險(xiǎn)電纜的內(nèi)部連接信息- 命令電纜連接器電線顏色測(cè)量針端子#黑色#AT白色#BT屏蔽排液# ET屏蔽排液#N/CTBLK#HT綠色#GT屏蔽排液#1N/CTBLaided屏蔽#N/CT至接地螺柱 機(jī)電源電纜電線連接器編號(hào)顏色測(cè)量針端子 屏蔽/排水管接地黑色 ECPCTxx電機(jī)電源電纜電線連接器數(shù)字顏色測(cè)量針端子 延長(zhǎng)電纜長(zhǎng)度,用于與ES或DES驅(qū)動(dòng)器連接。 并與單個(gè)設(shè)備格式解析器一起使用。例如:、:、:和:-CEUxx編碼器反饋電纜電線連接器對(duì)顏色表 伺服電機(jī)應(yīng)用指南以下步驟是旨在幫助伺服電機(jī)選擇的通用指南。下頁(yè)提供的公式應(yīng)與以下公式結(jié)合使用,以確定電機(jī)的最終尺寸。如需進(jìn)一步幫助,請(qǐng)?zhí)顚?xiě)相應(yīng)的應(yīng)用數(shù)據(jù)表頁(yè)面,并與當(dāng)?shù)氐腁llenBradley銷(xiāo)售辦公室聯(lián)系。確定電機(jī)速度要求。根據(jù)應(yīng)用絲杠、齒條和銷(xiāo)的動(dòng)力傳動(dòng)系配置,傳送或確定伺服電機(jī)的平均轉(zhuǎn)速和峰值。選擇速度曲線,以提供接近您的循環(huán)的閉合值。三角形速度曲線/ 確定所需的最小連續(xù)電機(jī)扭矩。計(jì)算電機(jī)扭矩,計(jì)算公式,或…確定加速負(fù)載所需的峰值電機(jī)扭矩。如果發(fā)動(dòng)機(jī)必須在指定的時(shí)間內(nèi)加速,請(qǐng)使用特定動(dòng)力傳動(dòng)系配置的表格確定系統(tǒng)轉(zhuǎn)速,否則請(qǐng)停止。使用時(shí)間來(lái)實(shí)現(xiàn)每分鐘的峰值,每分鐘的變化?rpm、動(dòng)力傳動(dòng)系慣性系統(tǒng)慣性和負(fù)載扭矩T以下兩個(gè)公式中的一個(gè):系統(tǒng)慣性b-
This section provides servo motor cable wiring information P output and internal connection information of dangerous cables - command cable connector wire color measuring pin terminal # black # AT white # BT shielding drain # ET shielding drain # N/CTBLK # HT green # GT shielding drain # 1N/CTBLaid shield # N/CT to grounding stud machine power cable wire connector number color measuring pin terminal shield/drain pipe grounding black ECPCTxx motor power cable wire connector digital color Color measuring pin terminal extension cable length for connection with ES or DES driver. It is used with a single device format parser. For example:,:,: and: - CEUxx encoder feedback cable wire connector application guide for color table servo motor The following steps are general guidelines designed to help servo motor selection. The formula provided on the next page shall be used in combination with the following formula to determine the final size of the motor. For further assistance, please fill in the corresponding application data sheet page and contact your local Allen Bradley sales office. Determine motor speed requirements. Transmit or determine the average speed and peak value of the servo motor according to the power train configuration of the applied lead screw, rack and pin. Select the velocity curve to provide a closure value close to your loop. Delta speed curve/Determine the minimum continuous motor torque required. Calculate the motor torque, calculate the formula, or... determine the peak motor torque required to accelerate the load. If the engine must accelerate within the specified time, use the table for the specific power train configuration to determine the system speed, otherwise stop. Use time to achieve the peak value per minute, the change per minute ? rpm, the inertia of the power train inertial system and the load torque T, which is one of the following two formulas: system inertia b-








